Boyson Road Bridge Scheduled to Close on Monday, July 14

HIAWATHA, IA – June 10, 2025 – If your travels in Hiawatha take you across Interstate 380 on Boyson Road, you need to be aware of an upcoming project that may slow down your trip.

The Iowa DOT Manchester construction office announces that the Boyson Road bridge over I-380 will be closing Monday, July 14, for 20 working days. During this time all four I-380 ramps will be closed.

During the closure period, construction crews will be connecting the ends of this segment to the Center Point intersection and to the round-about at 12th Avenue. The northbound ramp intersection will also be completed. At the end of the closure period, the northbound exit ramp will reopen, but the northbound entrance ramp will remain closed for a couple weeks longer.

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or X (find links at  https://iowadot.gov/travel-tools/iowa-511/511-social-media-sites); or download the free app to your mobile device.

It’s easy to subscribe to Your 511 and sign up to receive email/text alerts. Visit https://new.511ia.org/#login to sign up. For instructions and help with this feature, visit https://www.511ia.org/help/section/how-to-create-and-manage-a-511-account.html.

#

For general information about this project, contact Hugh Holak, Iowa DOT Manchester construction office, at 563 927-2397 or hugh.holak@iowadot.us.